THS

Objective: To reconstruct, using reverse engineering, a pipeline crossing project over a watercourse that complies with client requirements and current regulations. The project will be submitted to the DGA for approval.

Activities: Field data collection, including topobathymetric surveys and hydrological analysis based on DGA statistical data and verified through direct streamflow measurements.

Desktop studies: Hydraulic modeling, fluvial mechanics, hydraulic design, engineering drafts, and submission of the project to the DGA.